Step 4 Agreement: BQnet System and Handbook EL-303 (2004)

Step 4 Settlement requires the Postal Service to provide the APWU with a current complete electronic copy of BQnet for uploading to an APWU server, and to provide such electronic copy twice a year (in January and July).

EL-303 , BQnet , Qualification Standards , position description , job description

return to Contract Database

Step 4 Settlement requires the Postal Service to provide the APWU with a current complete electronic copy of BQnet for uploading to an APWU server, and to provide such electronic copy twice a year (in January and July).

Document Type:  Step 4 Agreement

GATS Number:  HOC-NA-C 19011

Tags: EL-303 , BQnet , Qualification Standards , position description , job description

return to Contract Database

Related Documents

SHOW FILTERS ›

E.g., 03/28/2024
E.g., 03/28/2024

National Award Goldberg: Article 12 Minimum Qualifications (2014)

June 24, 2014

Document Type: National Arbitration

minimum qualifications, excessing, light duty, limited duty

Step 4 Agreement: Article 37.3.E & Job Postings / Qualification Standards (2015)

June 10, 2015

Document Type: Step 4 Agreement

Craft: Clerk

APWU National Grievance Number: HQTC20081

Posting and Bidding, HRSSC, Information on Notices, Training Requirements, Deferment Period, Qualification Standards, Occupational Code, Testing, Training, Posting, Bidding, Shared Services, Informed Decision, computer bidding, Clerk Craft bidding, typing test, scheme

Step 4 Agreement: Elimination of Scheme Requirements (2016)

January 8, 2016

Step 4 Agreement: Elimination of Scheme Requirements (2016)

Document Type: Step 4 Agreement

Craft: Clerk

APWU National Grievance Number: HQTC20150333

scheme, scheme training, scheme requirements, elimination of scheme, dexterity, Training, duty assignments, Posting and Bidding, SONIKS, M-5, skills required, skill, overtime skill, Overtime