Step 4 Settlement Agreement: Article 19; Handbooks and Manuals (1987)
Return to Contract DatabaseThis Step 4 Settlement Agreement addresses whether an outside contractor should have been hired to repair the sprinkler system. After reviewing this matter, the parties mutually agreed that no national interpretive issue is fairly presented in this case, and that whether the proper action was taken was a local matter to be determined at the regional level based on the fact circumstances of this particular case using Chapter 530 of the ASM as a guide.
APWU National Grievance Number: H4T2BC9553
Subcontracting, contracting out, Handbooks and Manuals, Article 19, ASM 530, Administrative Support Manual 530, sprinkler system repair