National Award on Subcontracting AOI Installation and Maintenance (2010)

Article 32.1.B , Associated Office Infrastructure , AOI , LAN cabling

return to Contract Database

Arbitrator Shyam Das sustained the APWU grievance and ruled that the USPS violated Article 32.1.B by not giving the union an opportunity to meet with it regarding AOI installation and maintenance work involving cabling and AOI servers. Arbitrator Das ordered that the Postal Service assign maintenance of “AOI servers – to the extent they remain in operation – and the LAN cabling within the AOs to the maintenance craft.” He also directed that the parties discuss “the possibility of additional LAN maintenance work in the AOs being assigned to the bargaining unit.”

Document Type:  National Arbitration

APWU National Grievance Number:  Q94T4QC97031616

GATS Number:  Q94T-4Q-C 97031616

Craft:  Maintenance

Arbitrator Name: Shyam Das

Tags: Article 32.1.B , Associated Office Infrastructure , AOI , LAN cabling

return to Contract Database